🚜 Earthwork & Slope Specialist

Grading and Soil Preparation in Oakville, Mississauga & Burlington

Good turf and planting work begin below the visible finish. Grading determines where surface water moves during heavy rain, while soil preparation creates a workable root zone.

Grading and soil preparation planning scene
Groundwork Essentials

Protecting Your Foundation & Turf Health

01

Positive Slope Direction

Shaping the sub-base so water drains away from house foundations towards swales or catch basins.

02

Soil De-compaction & Tilling

Assessing compaction, soil texture, drainage observations, and the preparation approach suited to the site.

03

Screened Topsoil Blending

Spreading 2"-4" of screened triple-mix topsoil for optimal root nutrition before sod laying.

Grading FAQs

Frequently Asked Questions

Can new sod hide underlying drainage or pooling problems? +

No. New sod follows the exact contours of the soil below it. If low spots or negative slope are not corrected during grading first, water will continue to pool on top of the new sod.

Grading & Drainage Guides