Professional Sod Installation in Oakville, Mississauga & Burlington
A new lawn is easiest to enjoy when the groundwork, soil preparation, and initial watering routine are handled properly from day one.
Where Professional Sod Installation Starts
Great lawns are built from the ground up. Here is how we transform your yard into a lush, healthy green lawn.
Old Lawn Removal
Excavation of weeds, dead grass, and debris down to clean, workable sub-grade.
Soil Prep & Tilling
Adding rich organic topsoil, tilling, and fine grading for proper moisture retention and root growth.
Fresh Turf Laying
Laying fresh sod with seams and turf selection confirmed for the property and project scope.
Rolling & Initial Soak
Heavy lawn rolling to eliminate air pockets, followed by deep initial watering guidance.
See Fresh Sod Installation in Action
From existing-turf removal and soil preparation to fresh sod laying, with the final sequence confirmed during the estimate.
Fresh Sod Laying
Fresh turf is laid after the base, soil preparation, access, and selected turf type are confirmed.
Old Turf Excavation & Sub-base Tilling
Proper soil preparation, weed removal, and rototilling before laying new sod rolls.
🌱 First 2 Weeks Sod Care Routine
Water deeply every morning during the first 14 days so moisture reaches 4 to 6 inches into the soil. Keep foot traffic off the new turf until the roots bond firmly with the base soil.
Frequently Asked Questions
Can sod be installed over compacted or existing grass?
Installing sod over existing grass or an unprepared compacted base can interfere with rooting. Old growth, debris, and soil preparation needs are confirmed for the property before installation.
How soon can we walk on new sod after installation?
Light foot traffic is okay after 10–14 days once root knitted bond begins. Normal lawn activities and first mowing can typically occur around 2–3 weeks post-installation.